Production lot sizing with process deterioration and machine breakdown
From MaRDI portal
Publication:2455620
DOI10.1016/j.ejor.2007.01.011zbMath1137.90306OpenAlexW2021634371MaRDI QIDQ2455620
Tulika Chakraborty, Kripasindhu Chaudhuri, Bibhas Chandra Giri
Publication date: 25 October 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2007.01.011
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (13)
Production and payment policies for an imperfect manufacturing system with discount cash flows analysis in fuzzy random environments ⋮ Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system ⋮ Quality risk prediction at a non-sampling station machine in a multi-product, multi-stage, parallel processing manufacturing system subjected to sequence disorder and multiple stream effects ⋮ Modeling an inventory problem with random supply, inspection and machine breakdown ⋮ Joint determination of optimal safety stocks and production policy for an imperfect production system ⋮ Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time ⋮ An EMQ model in an imperfect production process ⋮ Reserve stock models: deterioration and preventive replenishment ⋮ Joint effect of stock threshold level and production policy on an unreliable production environment ⋮ Economic production quantity with the presence of imperfect quality and random machine breakdown and repair based on the artificial bee colony heuristic ⋮ Stochastic manufacturing system with process deterioration and machine breakdown ⋮ EPQ model with learning consideration, imperfect production and partial backlogging in fuzzy random environment ⋮ Combined production-maintenance decisions in situations with process deterioration
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Analysis of a production-inventory system with machine breakdowns and shutdowns
- Optimal production run length for products sold with warranty
- An EMQ model with inspections and random machine failures
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Production Lot Sizing with Machine Breakdowns
- Production Batching with Machine Breakdowns and Safety Stocks
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
- Production-Inventory Systems with Unreliable Machines
- Joint determination of preventive maintenance and safety stocks in an unreliable production environment
- Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
- Exact formulation of stochastic EMQ model for an unreliable production system
- Integrating quality and maintenance decisions in a production-inventory model for deteriorating items
This page was built for publication: Production lot sizing with process deterioration and machine breakdown