Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
From MaRDI portal
Publication:2463495
DOI10.1016/j.ejor.2007.03.006zbMath1149.90022OpenAlexW2075591871MaRDI QIDQ2463495
Viswanath Kumar Ganesan, Kunpeng Li, Appa Iyer Sivakumar
Publication date: 12 December 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2007.03.006
Related Items
Integrated production and logistics planning: contract manufacturing and choice of air/surface transportation ⋮ Synchronizing production and air transportation scheduling using mathematical programming models ⋮ A heuristic approach to a single stage assembly problem with transportation allocation ⋮ Parallel batch processing machines scheduling in cloud manufacturing for minimizing total service completion time ⋮ Integrated production and distribution with fixed delivery departure dates ⋮ Risk Based Optimization of Electronics Manufacturing Supply Chains ⋮ A modified Pareto genetic algorithm for multi-objective build-to-order supply chain planning with product assembly ⋮ Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Optimization by Simulated Annealing
- Algorithm for minimizing weighted earliness penalty in single-machine problem
- Simulated annealing: A tool for operational research
- Single machine scheduling to minimize weighted earliness subject to no tardy jobs
- Equivalence of mean flow time problems and mean absolute deviation problems
- A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems
- Effects of change of scale on optimality in a scheduling model with priorities and earliness/tardiness penalties
- Scheduling with common due date, earliness and tardiness penalties for multimachine problems: a survey
- Synchronized Development of Production, Inventory, and Distribution Schedules
- Minimizing the average deviation of job completion times about a common due date
- Optimization by Simulated Annealing: An Experimental Evaluation; Part I, Graph Partitioning
- Integrated Scheduling of Production and Distribution Operations
- Minimizing the sum of job earliness and tardiness in a multimachine system
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
- Machine scheduling with transportation considerations
- Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties