Rescheduling manufacturing systems: A framework of strategies, policies, and methods
From MaRDI portal
Publication:2464377
DOI10.1023/A:1022235519958zbMath1154.90500OpenAlexW1499199352MaRDI QIDQ2464377
Publication date: 20 December 2007
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1022235519958
Related Items (60)
Rescheduling problems with allowing for the unexpected new jobs arrival ⋮ Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns ⋮ Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis ⋮ Replanning working time under annualised working hours ⋮ A discrete time reactive scheduling model for new order insertion in job shop, make-to-order industries ⋮ Practical solutions for a dock assignment problem with trailer transportation ⋮ Finding robust timetables for project presentations of student teams ⋮ Rescheduling on identical parallel machines with machine disruptions to minimize total completion time ⋮ A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions ⋮ Rescheduling with new orders and general maximum allowable time disruptions ⋮ Taking advantage of a diverse set of efficient production schedules: a two-step approach for scheduling with side concerns ⋮ A holonic approach to flexible flow shop scheduling under stochastic processing times ⋮ Improving schedule stability in single-machine rescheduling for new operation insertion ⋮ Rescheduling optimization of steelmaking-continuous casting process based on the Lagrangian heuristic algorithm ⋮ Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization ⋮ Real-time production scheduling in the Industry-4.0 context: addressing uncertainties in job arrivals and machine breakdowns ⋮ Predictive-reactive strategy for identical parallel machine rescheduling ⋮ Rescheduling for new orders on a single machine with setup times ⋮ Scheduling multi-mode projects under uncertainty to optimize cash flows: a Monte Carlo ant colony system approach ⋮ Applying local rescheduling in response to schedule disruptions ⋮ Minimizing conditional-value-at-risk for stochastic scheduling problems ⋮ Scheduling modular projects on a bottleneck resource ⋮ An improved hybrid metaheuristics and rule-based approach for flexible job-shop scheduling subject to machine breakdowns ⋮ Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times ⋮ Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original Jobs ⋮ Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks ⋮ Dynamic scheduling of patients in emergency departments ⋮ Algorithms for rescheduling jobs with a LIFO buffer to minimize the weighted number of late jobs ⋮ Strategies for dispatching AGVs at automated seaport container terminals ⋮ Dynamic supply chain scheduling ⋮ Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption ⋮ Rescheduling problems with agreeable job parameters to minimize the tardiness costs under deterioration and disruption ⋮ Integrated process planning and scheduling/rescheduling—an agent-based approach ⋮ Rescheduling for machine disruption to minimize makespan and maximum lateness ⋮ An approach to predictive-reactive scheduling of parallel machines subject to disruptions ⋮ Method of rescheduling for hybrid production lines with intermediate buffers ⋮ Distributed supply‐chain project rescheduling: Part I—impacts of information‐sharing strategies ⋮ Terminal inventory level constraints for online production scheduling ⋮ Integer programming approach to reactive scheduling in make-to-order manufacturing ⋮ Parallel machine match-up scheduling with manufacturing cost considerations ⋮ Reactive scheduling in the multi-mode RCPSP ⋮ Robustness of cyclic schedules for the charging of batteries ⋮ Project scheduling under uncertainty: survey and research potentials ⋮ A survey of dynamic scheduling in manufacturing systems ⋮ An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns ⋮ Issues and opportunities regarding replanning and rescheduling frequencies ⋮ Comparing the impact of different rescheduling strategies on the entropic-related complexity of manufacturing systems ⋮ Single-machine rescheduling with deterioration and learning effects against the maximum sequence disruption ⋮ Multi-objective master production scheduling in make-to-order manufacturing ⋮ A MIP-based local search method for the railway rescheduling problem ⋮ Maximizing the number of jobs scheduled at their baseline starting times in case of machine failures ⋮ Structure and simulation evaluation of an integrated real-time rescheduling system for railway networks ⋮ Distributed supply-chain project rescheduling: part II—distributed affected operations rescheduling algorithm ⋮ Dynamic flexibility metrics for capability and capacity ⋮ Optimally rescheduling jobs with a last-in-first-out buffer ⋮ Reoptimization framework and policy analysis for maritime inventory routing under uncertainty ⋮ Rescheduling due to machine disruption to minimize the total weighted completion time ⋮ A tabu search algorithm for scheduling pharmaceutical packaging operations ⋮ The resource-constrained activity insertion problem with minimum and maximum time lags ⋮ Two-machine shop scheduling: Compromise between flexibility and makespan value
This page was built for publication: Rescheduling manufacturing systems: A framework of strategies, policies, and methods