A stronger complexity result for the single machine multi-operation jobs scheduling problem to minimize the number of tardy jobs
From MaRDI portal
Publication:2464405
DOI10.1023/A:1026276627133zbMath1154.90427OpenAlexW1487971107MaRDI QIDQ2464405
Publication date: 20 December 2007
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1026276627133
Related Items
Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work ⋮ Single-machine scheduling of multi-operation jobs without missing operations to minimize the total completion time ⋮ A survey of scheduling problems with setup times or costs