Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Single-machine scheduling problems with past-sequence-dependent setup times - MaRDI portal

Single-machine scheduling problems with past-sequence-dependent setup times

From MaRDI portal
Publication:2467251

DOI10.1016/j.ejor.2006.03.066zbMath1137.90498OpenAlexW2010369523MaRDI QIDQ2467251

Kyparisis, George J., Christos P. Koulamas

Publication date: 21 January 2008

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2006.03.066




Related Items (max. 100)

Minimizing the makespan on a single machine subject to modular setupsPermutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machinesDue-window assignment scheduling with past-sequence-dependent setup timesScheduling jobs with general truncated learning effects including proportional setup timesSingle-machine due-date assignment scheduling with generalized earliness-tardiness penalties including proportional setup timesSingle machine scheduling with past-sequence-dependent setup times and learning effectsThe third comprehensive survey on scheduling problems with setup times/costsSingle machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup timesScheduling with job-splitting considering learning and the vital-few lawScheduling problems with past-sequence-dependent setup times and general effects of deterioration and learningTotal absolute deviation of job completion times on uniform and unrelated machinesSingle machine scheduling with general time-dependent deterioration, position-dependent learning and past-sequence-dependent setup timesAn application of dynamic programming to assign pressing tanks at wineriesSingle-machine past-sequence-dependent setup times scheduling with resource allocation and learning effectDue-window assignment scheduling with job-rejection, truncated learning effects and setup timesSingle-machine scheduling problems with job rejection, deterioration effects and past-sequence-dependent setup timesSolution algorithms for single-machine scheduling with learning effects and exponential past-sequence-dependent delivery timesNew results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectivesResource dependent scheduling with truncated learning effectsSingle machine scheduling with a general exponential learning effectResearch on position-dependent weights scheduling with delivery times and truncated sum-of-processing-times-based learning effectNew results on single-machine scheduling with past-sequence-dependent delivery timesSingle-machine scheduling with past-sequence-dependent setup times and general effects of deterioration and learningSingle-machine scheduling with past-sequence-dependent delivery times and release timesDue date single machine scheduling problems with nonlinear deterioration and learning effects and past sequence dependent setup timesErratum to ``Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects [Appl. Math. Modelling 35 (2011) 1388-1395] ⋮ A note on single-machine scheduling with general learning effect and past-sequence-dependent setup timeA note: minimizing total absolute deviation of job completion times on unrelated machines with general position-dependent processing times and job-rejectionSingle-machine scheduling against due dates with past-sequence-dependent setup timesProduction planning of a failure-prone manufacturing system under different setup scenariosA survey of scheduling problems with setup times or costsSome scheduling problems with past sequence dependent setup times under the effects of nonlinear deterioration and time-dependent learningA state-of-the-art review on scheduling with learning effectsSingle-machine scheduling with past-sequence-dependent setup times and learning effects: a parametric analysisSingle machine group scheduling with learning effects and past-sequence-dependent setup timesRevisiting dynamic programming for precedence-constrained traveling salesman problem and its time-dependent generalizationA survey of scheduling problems with no-wait in processSequencing and scheduling for filling lines in dairy productionTwo-agent single-machine scheduling with cumulative deteriorationSingle machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effectsUnrelated parallel machine scheduling with past-sequence-dependent setup time and learning effectsSingle-machine scheduling with deteriorating jobs and past-sequence-dependent setup timesMinimizing the total completion time in a single-machine scheduling problem with a learning effectSingle-machine scheduling with sum-of-logarithm-processing-times-based learning considerationsScheduling of tasks with effectiveness precedence constraintsMinimizing total weighted completion time on single machine with past-sequence-dependent setup times and exponential time-dependent and position-dependent learning effectsParallel-machine scheduling with job-dependent cumulative deterioration effect and rejectionDue date assignment scheduling with positional-dependent weights and proportional setup timesThe due date assignment scheduling problem with the deteriorating jobs and delivery timeA classification of dynamic programming formulations for offline deterministic single-machine scheduling problemsNew exact and heuristic algorithms to solve the prize-collecting job sequencing problem with one common and multiple secondary resourcesSCHEDULING POSITION-BASED DETERIORATING JOBS WITH MULTIPLE RATE-MODIFYING ACTIVITIES AND PAST-SEQUENCE-DEPENDENT DELIVERY TIMES



Cites Work


This page was built for publication: Single-machine scheduling problems with past-sequence-dependent setup times