Stochastic single machine scheduling subject to machines breakdowns with quadratic early-tardy penalties for the preemptive-repeat model
From MaRDI portal
Publication:2471329
DOI10.1007/BF02832346zbMath1178.90169MaRDI QIDQ2471329
Publication date: 22 February 2008
Published in: Journal of Applied Mathematics and Computing (Search for Journal in Brave)
Related Items (2)
Optimal rules for single machine scheduling with stochastic breakdowns ⋮ Bi-objective single machine scheduling problem with stochastic processing times
Cites Work
- Unnamed Item
- Unnamed Item
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
- General stochastic single-machine scheduling with regular cost functions
- Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs
- Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria
- Scheduling stochastic jobs on a single machine subject to breakdowns
- Sequencing with Earliness and Tardiness Penalties: A Review
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- Minimising Waiting Time Variance in the Single Machine Problem
- Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties
- STOCHASTIC SCHEDULING WITH PREEMPTIVE-REPEAT MACHINE BREAKDOWNS TO MINIMIZE THE EXPECTED WEIGHTED FLOW TIME
- Single-machine scheduling subject to stochastic breakdowns
- Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties
This page was built for publication: Stochastic single machine scheduling subject to machines breakdowns with quadratic early-tardy penalties for the preemptive-repeat model