Analysis of heuristics for the UET two-machine flow shop problem with time delays
From MaRDI portal
Publication:2482380
DOI10.1016/j.cor.2007.02.015zbMath1135.90016OpenAlexW2162576986MaRDI QIDQ2482380
Djamal Rebaine, V. J. Rayward-Smith
Publication date: 16 April 2008
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2007.02.015
Analysis of algorithms (68W40) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
Cites Work
- Permutation vs. non-permutation flow shop schedules
- Polynomial time algorithms for the UET permutation flowshop problem with time delays
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Optimal two- and three-stage production schedules with setup times included
- Flowshop and Jobshop Schedules: Complexity and Approximation
- UET flow shop scheduling with delays
- Unnamed Item
- Unnamed Item