Multi-mode project payment scheduling problems with bonus-penalty structure
From MaRDI portal
Publication:2482794
DOI10.1016/j.ejor.2006.07.053zbMath1146.90414OpenAlexW2067875968MaRDI QIDQ2482794
Publication date: 24 April 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.07.053
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (12)
The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models ⋮ A reduction tree approach for the discrete time/cost trade-off problem ⋮ Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms ⋮ Optimizing version release dates of research and development long-term processes ⋮ Capital- and resource-constrained project scheduling with net present value optimization ⋮ Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies ⋮ Metaheuristics for multi-mode capital-constrained project payment scheduling ⋮ An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem ⋮ Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective ⋮ Simulated annealing and tabu search for multi-mode project payment scheduling
Cites Work
- The scheduling of activities to maximize the net present value of projects
- Project network models with discounted cash flows a guided tour through recent developments
- An equitable approach to the payment scheduling problem in project management
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- Progress payments in project scheduling problems.
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- Project Contracts and Payment Schedules: The Client's Problem
- On modelling payments in projects
- Cash Flows in Networks
- The payment scheduling problem
- A two stage search heuristic for scheduling payments in projects
- Maximizing the net present value of a project under resource constraints using a Lagrangian relaxation based heuristic with tight upper bounds
This page was built for publication: Multi-mode project payment scheduling problems with bonus-penalty structure