Statistical estimation algorithms for repairs-time limit replacement scheduling under earning rate criteria
From MaRDI portal
Publication:2494800
DOI10.1016/j.camwa.2005.11.004zbMath1110.90023OpenAlexW2054007087MaRDI QIDQ2494800
Shunji Osaki, Akira Ashioka, Tadashi Dohi, Naoto Kaio
Publication date: 30 June 2006
Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.camwa.2005.11.004
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25)
Related Items (2)
A Repair-Time Limit Replacement Policy With Estimation Error ⋮ DISCRETE REPAIR-COST LIMIT REPLACEMENT POLICIES WITH/WITHOUT IMPERFECT REPAIR
Cites Work
- The optimal repair-time limit replacement policy with imperfect repair: Lorenz transform approach
- A Note on the Repair Limit Replacement Policy
- Optimal Repair Limit Replacement Policies with Imperfect Repair
- Relationships Between Some Notions Which are Common to Reliability Theory and Economics
- Repair Limit Policies for Vehicle Replacement†
- Optimum preventive maintenance and repair limit policies maximizing the expected earning rate
- Convergence theorems for empirical Lorenz curves and their inverses
- A General Definition of the Lorenz Curve
- Utilizing Weibull Failure Rates in Repair Limit Analysis for Equipment Replacement/Preventive Maintenance Decisions
This page was built for publication: Statistical estimation algorithms for repairs-time limit replacement scheduling under earning rate criteria