A complex time based construction heuristic for batch scheduling problems in the chemical industry
From MaRDI portal
Publication:2503084
DOI10.1016/J.EJOR.2005.03.011zbMath1103.90041OpenAlexW2080457039MaRDI QIDQ2503084
Johannes Hatzl, Rainer E. Burkard
Publication date: 13 September 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.03.011
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (3)
A sustainable aggregate production planning model for the chemical process industry ⋮ On the integration of diverging material flows into resource-constrained project scheduling ⋮ MILP-based campaign scheduling in a specialty chemicals plant: a case study
Cites Work
- Unnamed Item
- Batch scheduling in process industries: An application of resource-constrained project scheduling
- Advanced production scheduling for batch plants in process industries
- Planning and scheduling in the process industry
- Optimal periodic scheduling of multipurpose batch plants
- LP-based heuristics for scheduling chemical batch processes
- A process scheduling problem arising from chemical production planning
This page was built for publication: A complex time based construction heuristic for batch scheduling problems in the chemical industry