Production planning with load dependent lead times
From MaRDI portal
Publication:2507500
DOI10.1007/s10288-005-0083-9zbMath1134.90375OpenAlexW2005260425MaRDI QIDQ2507500
Stefan Voß, David L. Woodruff, Julia Pahl
Publication date: 11 October 2006
Published in: 4OR (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10288-005-0083-9
Applications of mathematical programming (90C90) Management decision making, including multiple objectives (90B50) Production models (90B30) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02)
Related Items (12)
Twelve surveys in operations research ⋮ Production planning with order acceptance and demand uncertainty ⋮ Using metaheuristic and fuzzy system for the optimization of material pull in a push-pull flow logistics network ⋮ Surveys in operations research ⋮ Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions ⋮ Eleven surveys in operations research ⋮ Production planning with load dependent lead times: An update of research ⋮ Integrating operations and marketing decisions using delayed differentiation of products and guaranteed delivery time under stochastic demand ⋮ Coordinating lead times and safety stocks under autocorrelated demand ⋮ Heuristics for capacity planning problems with congestion ⋮ Production planning with resources subject to congestion ⋮ Integrated production planning and order acceptance under uncertainty: a robust optimization approach
This page was built for publication: Production planning with load dependent lead times