An integrated approach for modeling and solving the scheduling problem of container handling systems
From MaRDI portal
Publication:2508124
DOI10.1631/jzus.2006.A0234zbMath1163.90483OpenAlexW1969257624MaRDI QIDQ2508124
Pierre Dejax, Nathalie Bostel, Jianguo Cai, Lu Chen, Li-Feng Xi
Publication date: 9 October 2006
Published in: Journal of Zhejiang University. Science A (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1631/jzus.2006.a0234
Related Items (3)
Machine scheduling in underground mining: an application in the potash industry ⋮ The hybrid flow shop scheduling problem ⋮ A genetic algorithm for optimization of integrated scheduling of cranes, vehicles, and storage platforms at automated container terminals
Uses Software
Cites Work
- Unnamed Item
- Global lower bounds for flow shops with multiple processors
- Local search algorithms for the multiprocessor flow shop scheduling problem
- The flow shop with parallel machines: A tabu search approach
- Transshipment of containers at a container terminal: An overview
- A crane scheduling method for port container terminals
- Applying tabu search to the job-shop scheduling problem
- Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines
- The Vehicle Routing Problem
- An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals
- Job Shop Scheduling by Simulated Annealing
- Tabu Search—Part I
- Tabu Search—Part II
- Parallel Taboo Search Techniques for the Job Shop Scheduling Problem
This page was built for publication: An integrated approach for modeling and solving the scheduling problem of container handling systems