Group scheduling on two cells with intercell movement
From MaRDI portal
Publication:2563903
DOI10.1016/0305-0548(96)00003-2zbMath0863.90095OpenAlexW2021185223MaRDI QIDQ2563903
Publication date: 10 June 1997
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0305-0548(96)00003-2
branch-and-boundlower boundheuristicgroup scheduling on two cellsGT/CM systemintercell movementmean flow time of jobs
Related Items (3)
A comprehensive review of flowshop group scheduling literature ⋮ Solving an integrated cell formation and group layout problem using a simulated annealing enhanced by linear programming ⋮ Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
Cites Work
This page was built for publication: Group scheduling on two cells with intercell movement