Clustered flow shop models
From MaRDI portal
Publication:2564881
DOI10.1007/BF00121678zbMath0866.90078OpenAlexW2049716821MaRDI QIDQ2564881
Publication date: 7 January 1997
Published in: Journal of Global Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf00121678
Cites Work
- Unnamed Item
- Unnamed Item
- Optimal two- and three-stage production schedules with setup times included
- Permutation flow-shop theory revisited
- Flow Shop Problems with Time Lags
- The clustered flow-shop problem
- ON EQUIVALENT-JOB FOR JOB-BLOCK IN 2×n SEQUENCING PROBLEM WITH TRANSPORTATION-TIMES
- TWO-MACHINE SCHEDULING UNDER REQUIRED PRECEDENCE AMONG JOBS
- THREE-MACHINE SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS
- TWO-MACHINE SCHEDULING UNDER ARBITRARY PRECEDENCE CONSTRAINTS
- Special cases of the flow-shop problem