Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Scatter search for project scheduling with resource availability cost - MaRDI portal

Scatter search for project scheduling with resource availability cost

From MaRDI portal
Publication:2570160

DOI10.1016/j.ejor.2004.08.019zbMath1079.90066OpenAlexW2009184921MaRDI QIDQ2570160

Denise Sato Yamashita, Manuel Laguna, Vinicius Amaral Armentano

Publication date: 26 October 2005

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2004.08.019




Related Items (19)

A metaheuristic solution approach for the time-constrained project scheduling problemMinimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approachMulti-mode resource availability cost problem with recruitment and release dates for resourcesEvolutionary algorithms for multi-objective stochastic resource availability cost problemA scatter search based hyper-heuristic for sequencing a mixed-model assembly lineRobust optimization models for project scheduling with resource availability costTabu search with path relinking for an integrated production-distribution problemMultimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedureCooperative co‐evolutionary scatter search for satellite module layout designAn effective heuristic for project scheduling with resource availability costSolving the resource availability cost problem in project scheduling by path relinking and genetic algorithmAn exact algorithm for minimizing resource availability costs in project schedulingTheoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problemsA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingUm algoritmo exato para o problema de programação de projetos com custo de disponibilidade de recursos e múltiplos modosA MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNINGScatter search for a real-life heterogeneous fleet vehicle routing problem with time windows and split deliveries in BrazilScatter search --- wellsprings and challengesSchedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization


Uses Software


Cites Work


This page was built for publication: Scatter search for project scheduling with resource availability cost