Project scheduling problem with stochastic activity duration times
From MaRDI portal
Publication:2572685
DOI10.1016/j.amc.2004.09.002zbMath1076.94044OpenAlexW2058164800MaRDI QIDQ2572685
Publication date: 4 November 2005
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2004.09.002
Stochastic programming (90C15) Approximation methods and heuristics in mathematical programming (90C59) Decoding (94B35)
Related Items (16)
A genetic algorithm for the robust resource leveling problem ⋮ Project scheduling problem with mixed uncertainty of randomness and fuzziness ⋮ Evaluating topological ordering in directed acyclic graphs ⋮ Evolutionary algorithms for multi-objective stochastic resource availability cost problem ⋮ Expected value model for optimizing the multiple bus headways ⋮ Solving project scheduling problem with the philosophy of fuzzy random programming ⋮ Scheduling multi-mode projects under uncertainty to optimize cash flows: a Monte Carlo ant colony system approach ⋮ A lexicographic approach to the robust resource-constrained project scheduling problem ⋮ Modeling stochastic project time-cost trade-offs with time-dependent activity durations ⋮ Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure ⋮ Fuzzy project scheduling problem and its hybrid intelligent algorithm ⋮ New fuzzy models for time-cost trade-off problem ⋮ Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem ⋮ Stochastic project scheduling with hierarchical alternatives ⋮ Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty ⋮ Reliability based assignment in stochastic-flow freight network
Cites Work
- Depedent-chance programming: A class of stochastic optimization
- Modelling stochastic decision systems using dependent-chance programming
- Uncertain programming: A unifying optimization theory in various uncertain environments
- Theory and practice of uncertain programming
- The project scheduling problem with irregular starting time costs
- Chance-Constrained Programming
- Critical-Path Planning and Scheduling: Mathematical Basis
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Another Look at the PERT Assumptions
- Critical Path Analyses Via Chance Constrained and Stochastic Programming
- Network planning with stochastic activity durations, an evaluation of PERT
- On the Expected Duration of PERT Type Networks
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints
This page was built for publication: Project scheduling problem with stochastic activity duration times