The minmax regret permutation flow-shop problem with two jobs
From MaRDI portal
Publication:2572850
DOI10.1016/j.ejor.2004.07.073zbMath1079.90047OpenAlexW1974652680MaRDI QIDQ2572850
Publication date: 4 November 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2004.07.073
Minimax problems in mathematical programming (90C47) Deterministic scheduling theory in operations research (90B35)
Related Items (9)
Heuristic algorithms for the minmax regret flow-shop problem with interval processing times ⋮ The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective ⋮ Exact solutions for the two-machine robust flow shop with budgeted uncertainty ⋮ Two-stage minimax regret robust uncapacitated lot-sizing problems with demand uncertainty ⋮ Robust permutation flow shop total weighted completion time problem: solution and application to the oil and gas industry ⋮ Min-max relative regret for scheduling to minimize maximum lateness ⋮ Approximating a two-machine flow shop scheduling under discrete scenario uncertainty ⋮ Minimizing total weighted flow time under uncertainty using dominance and a stability box ⋮ Min-max and min-max regret versions of combinatorial optimization problems: A survey
Cites Work
- Unnamed Item
- Robust discrete optimization and its applications
- Minmax regret solutions for minimax optimization problems with uncertainty
- Complexity of minimizing the total flow time with interval data and minmax regret criterion
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
- On the complexity of a class of combinatorial optimization problems with uncertainty
This page was built for publication: The minmax regret permutation flow-shop problem with two jobs