A PSO-based procedure for a bi-level multi-objective TOC-based job-shop scheduling problem
DOI10.1504/IJOR.2012.046343zbMath1362.90197OpenAlexW2031167722MaRDI QIDQ2627283
Voratas Kachitvichyanukul, Chompoonoot Kasemset
Publication date: 31 May 2017
Published in: International Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijor.2012.046343
TOCjob shop schedulingbi-level programmingPSOparticle swarm optimisationidle timeset-up timemulti-objective schedulingbottleneckstheory of constraintsproduct demandtransfer lot sizes
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (4)
Uses Software
This page was built for publication: A PSO-based procedure for a bi-level multi-objective TOC-based job-shop scheduling problem