Using a meta-heuristic algorithm for solving the multi-mode resource-constrained project scheduling problem
DOI10.1504/IJOR.2015.070859zbMath1362.90209OpenAlexW1555245939MaRDI QIDQ2627614
Farham Soleimani, Ali Arab, Javad Rezaeian, Somayeh Mohaselafshary
Publication date: 31 May 2017
Published in: International Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijor.2015.070859
project schedulingrobustnessmetaheuristicsmakespanmathematical modellingresource-constrained schedulingmulti-objective optimisationSPGAmulti-mode schedulingsub-population genetic algorithms
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (1)
Uses Software
This page was built for publication: Using a meta-heuristic algorithm for solving the multi-mode resource-constrained project scheduling problem