Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
An approximation scheme for minimizing the makespan of the parallel identical multi-stage flow-shops - MaRDI portal

An approximation scheme for minimizing the makespan of the parallel identical multi-stage flow-shops

From MaRDI portal
Publication:2636494

DOI10.1016/j.tcs.2017.09.018zbMath1393.68041OpenAlexW2760545295MaRDI QIDQ2636494

Weitian Tong, Randy Goebel, Eiji Miyano, Guo-Hui Lin

Publication date: 5 June 2018

Published in: Theoretical Computer Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.tcs.2017.09.018




Related Items (3)



Cites Work


This page was built for publication: An approximation scheme for minimizing the makespan of the parallel identical multi-stage flow-shops