A note on scheduling to meet two min-sum objectives
From MaRDI portal
Publication:2643821
DOI10.1016/J.ORL.2006.01.004zbMath1145.90016OpenAlexW2019167767MaRDI QIDQ2643821
Eric Angel, Evripidis Bampis, Aleksei V. Fishkin
Publication date: 27 August 2007
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.orl.2006.01.004
Related Items (8)
An almost tight lower bound for the scheduling problem to meet two min-sum objectives ⋮ An improved lower bound for a bi-criteria scheduling problem ⋮ Bi-objective matchings with the triangle inequality ⋮ Approximation algorithms for the bi-criteria weighted MAX-CUT problem ⋮ Approximation algorithms for multi-agent scheduling to minimize total weighted completion time ⋮ Two dimensional load balancing ⋮ An approximation scheme for the bi-scenario sum of completion times trade-off problem ⋮ A new approach for bicriteria partitioning problem
Cites Work
This page was built for publication: A note on scheduling to meet two min-sum objectives