Evolutionary algorithms for multi-objective stochastic resource availability cost problem
From MaRDI portal
Publication:2656542
DOI10.1007/s12597-020-00447-8OpenAlexW3028315427MaRDI QIDQ2656542
Majid Ebrahimzadeh, Amir Abbas Najafi, Masoud Arjmand
Publication date: 11 March 2021
Published in: Opsearch (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s12597-020-00447-8
schedulingMonte-Carlo simulationmulti-objective evolutionary algorithmsresource availability cost problemTOPSIS approach
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Multi-criteria trapezoidal valued intuitionistic fuzzy decision making with Choquet integral based TOPSIS
- Scheduling resource-constrained projects with a flexible project structure
- Solution of interval PERT/CPM network problems by a simplified tabular method
- Time slack-based techniques for robust project scheduling subject to resource uncertainty
- Efficient priority rules for the stochastic resource-constrained project scheduling problem
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
- An exact algorithm for minimizing resource availability costs in project scheduling
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Scheduling subject to resource constraints: Classification and complexity
- A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network
- Multiple attribute decision making. Methods and applications. A state-of- the-art survey
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Using tabu search to schedule activities of stochastic resource-constrained projects
- Activity nets: A guided tour through some recent developments
- Linear preselective policies for stochastic project scheduling
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- Multi-mode resource availability cost problem with recruitment and release dates for resources
- Forward-compatible framework with critical-chain project management using a max-plus linear representation
- The preemptive stochastic resource-constrained project scheduling problem
- Running time analysis of evolutionary algorithms on a simplified multiobjective knapsack problem
- TOPSIS and AHP techniques for selecting the most efficient marine container yard gantry crane
- Stochastic project scheduling with hierarchical alternatives
- Modeling of a scheduling problem with expected availability of resources
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
- Scatter search for project scheduling with resource availability cost
- Project scheduling problem with stochastic activity duration times
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Optimization guided lower and upper bounds for the resource investment problem
- Markov and Markov-Regenerative <scp>pert</scp> Networks
- Critical Path Analyses Via Chance Constrained and Stochastic Programming
- Distribution of the Time Through a Directed, Acyclic Network
- On the Expected Duration of PERT Type Networks
- Minimizing Resource Availability Costs in Time-Limited Project Networks