A bi-objective flexible flow shop scheduling problem with machine-dependent processing stages: trade-off between production costs and energy consumption
From MaRDI portal
Publication:2656739
DOI10.1016/J.AMC.2020.125533zbMath1497.90089OpenAlexW3044499748MaRDI QIDQ2656739
Ali Hasani, Seyed Mohammad Hassan Hosseini
Publication date: 16 March 2021
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2020.125533
schedulingunrelated parallel machinesflexible flow shopenergy consumptionproduction costsmachine-dependent processing stages
Related Items (4)
Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping ⋮ Shop scheduling in manufacturing environments: a review ⋮ A systematic review of multi-objective hybrid flow shop scheduling ⋮ Memory gradient method for multiobjective optimization
Uses Software
Cites Work
- Unnamed Item
- Energy-efficient scheduling in manufacturing companies: a review and research framework
- Carbon-efficient scheduling of flow shops by multi-objective optimization
- An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation
- Evolution of appropriate crossover and mutation operators in a genetic process
- Hybrid flexible flowshop problems: models and solution methods
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
- Evolutionary Algorithms for Solving Multi-Objective Problems
- Operational methods for minimization of energy consumption of manufacturing equipment
This page was built for publication: A bi-objective flexible flow shop scheduling problem with machine-dependent processing stages: trade-off between production costs and energy consumption