Just-in-time scheduling for a distributed concrete precast flow shop system
From MaRDI portal
Publication:2668621
DOI10.1016/j.cor.2020.105204OpenAlexW3118990082MaRDI QIDQ2668621
Linting Wang, Mengling Chu, Zhi Li, Yao Du, Fuli Xiong
Publication date: 7 March 2022
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2020.105204
Related Items (5)
\(N\)-NEH+ algorithm for solving permutation flow shop problems ⋮ A review and classification on distributed permutation flowshop scheduling problems ⋮ Formulations and an adaptive large neighborhood search for just-in-time scheduling of unrelated parallel machines with a common due window ⋮ Multiobjective particle swarm optimization with direction search and differential evolution for distributed flow-shop scheduling problem ⋮ Just‐in‐time scheduling problem with due windows and release dates for precast bridge girders
Cites Work
- A scatter search algorithm for the distributed permutation flowshop scheduling problem
- Optimal restricted due date assignment in scheduling
- Minimizing the total completion time in a distributed two stage assembly system with setup times
- NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness
- A tabu search algorithm for the single machine total weighted tardiness problem
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
- Minimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
- The distributed permutation flowshop scheduling problem
- Parallel machine scheduling with earliness and tardiness penalties
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
- An enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes
- Future paths for integer programming and links to artificial intelligence
- A decomposition algorithm for the single machine total tardiness problem
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
- Scheduling a non-professional indoor football league: a tabu search based approach
- An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors -- a case study
- An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
- Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs
- A survey on scheduling problems with due windows
- Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization
- Minimizing Total Tardiness on One Machine is NP-Hard
- Handbook of Heuristics
- A Fully Polynomial Approximation Scheme for the Weighted Earliness–Tardiness Problem
- Handbook of metaheuristics
This page was built for publication: Just-in-time scheduling for a distributed concrete precast flow shop system