Railway disruption management: designing bus bridging services under uncertainty
From MaRDI portal
Publication:2668706
DOI10.1016/j.cor.2021.105284OpenAlexW3133823185MaRDI QIDQ2668706
Publication date: 7 March 2022
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2021.105284
stochastic programming modelbus bridging services planmultimodal \(k\)-shortest path modelrail transit disruption recovery
Cites Work
- Unnamed Item
- A column generation approach for the rail crew re-scheduling problem
- Disruption management in the airline industry-concepts, models and methods
- Partitioning procedures for solving mixed-variables programming problems
- A variable neighbourhood search for fast train scheduling and routing during disturbed railway traffic situations
- The Benders decomposition algorithm: a literature review
- The sample average approximation method applied to stochastic routing problems: a computational study
- A model for setting services on auxiliary bus lines under congestion
- Maximum excess dominance: identifying impractical solutions in linear problems with interval coefficients
- Object modeling and path computation for multimodal travel systems
- The Sample Average Approximation Method for Stochastic Discrete Optimization
- Almost Stochastic Dominance for Most Risk-Averse Decision Makers
This page was built for publication: Railway disruption management: designing bus bridging services under uncertainty