A beam search algorithm for minimizing crane times in premarshalling problems
From MaRDI portal
Publication:2672129
DOI10.1016/j.ejor.2022.01.038OpenAlexW4210584346WikidataQ113875426 ScholiaQ113875426MaRDI QIDQ2672129
Francisco Parreño, Consuelo Parreño-Torres, Ramón Alvarez-Valdés
Publication date: 8 June 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2022.01.038
Transportation, logistics and supply chain management (90B06) Approximation methods and heuristics in mathematical programming (90C59) Discrete location and assignment (90B80)
Related Items (1)
Uses Software
Cites Work
- A biased random-key genetic algorithm for the container pre-marshalling problem
- A tree search procedure for the container pre-marshalling problem
- A new effective unified model for solving the pre-marshalling and block relocation problems
- An optimization model for the container pre-marshalling problem
- The bounded beam search algorithm for the block relocation problem
- Solving real-world sized container pre-marshalling problems with an iterative deepening branch-and-bound algorithm
- A feasibility-based heuristic for the container pre-marshalling problem
- An efficient ant colony optimization algorithm for the blocks relocation problem
- Integer programming models for the pre-marshalling problem
- An anytime tree search algorithm for the 2018 ROADEF/EURO challenge glass cutting problem
- Solving a large cutting problem in the glass manufacturing industry
- Deep learning assisted heuristic tree search for the container pre-marshalling problem
- A multi-heuristic approach for solving the pre-marshalling problem
- A branch and bound approach for large pre-marshalling problems
- A heuristic for retrieving containers from a yard
- Pre-processing a container yard under limited available time
- A Branch and Price Procedure for the Container Premarshalling Problem
This page was built for publication: A beam search algorithm for minimizing crane times in premarshalling problems