Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems
From MaRDI portal
Publication:2675651
DOI10.1007/s10479-021-04362-zzbMath1497.90094OpenAlexW3216957540MaRDI QIDQ2675651
Abdur Rahim, Aseem Mishra, Divya Shrivastava, Devesh Tarasia
Publication date: 24 September 2022
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-021-04362-z
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Reliability, availability, maintenance, inspection in operations research (90B25)
Related Items (1)
Cites Work
- Optimization by Simulated Annealing
- Imperfect maintenance
- Multi-stage simultaneous lot-sizing and scheduling for flow line production
- Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs
- An opportunistic group maintenance model for the multi-unit series system employing jaya algorithm
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem
- Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs
- Jaya: An Advanced Optimization Algorithm and its Engineering Applications
- OPTIMAL PERIODIC PREVENTIVE MAINTENANCE SCHEDULES WITH IMPROVEMENT FACTORS DEPENDING ON NUMBER OF PREVENTIVE MAINTENANCES
- Efficiency of Jaya algorithm for solving the optimization-based structural damage identification problem based on a hybrid objective function
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups
This page was built for publication: Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems