OPTIMIZATION OF PRODUCTION PLANNING PROBLEMS — A CASE STUDY FOR ASSEMBLY LINES
DOI10.1142/S012918310000081XzbMath0976.90065OpenAlexW2024934817MaRDI QIDQ2718392
Markus Puchta, Anja Ebersbach, Ingo Morgenstern, Johannes J. Schneider, Jürgen Britze
Publication date: 19 June 2001
Published in: International Journal of Modern Physics C (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s012918310000081x
schedulingsimulated annealingproduction planningsupply chain managementMonte Carlo optimizationenterprise resource planningassembly lineadvanced planning and scheduling
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Production models (90B30) Case-oriented studies in operations research (90B90)
Related Items (1)
Uses Software
Cites Work
- Optimization by Simulated Annealing
- Threshold accepting: A general purpose optimization algorithm appearing superior to simulated annealing
- Searching for backbones -- an efficient parallel algorithm for the traveling salesman problem
- Full characterization of a strange attractor. Chaotic dynamics in low- dimensional replicator systems
This page was built for publication: OPTIMIZATION OF PRODUCTION PLANNING PROBLEMS — A CASE STUDY FOR ASSEMBLY LINES