Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain

From MaRDI portal
Publication:271954

DOI10.1007/s10479-015-2100-5zbMath1347.90006OpenAlexW2197781492MaRDI QIDQ271954

Ata Allah Taleizadeh, Mohsen Lashgari, Abbas Ahmadi

Publication date: 20 April 2016

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10479-015-2100-5




Related Items (22)

Non-instantaneous deterioration effect in ordering decisions for a two-warehouse inventory system under advance payment and backloggingOptimal selling price, replenishment cycle and payment time among advance, cash, and credit payments from the seller's perspectiveRetailer's optimal strategy for a perishable product with increasing demand under various payment schemesInventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backorderingRetailer's credit and inventory decisions for imperfect quality and deteriorating items under two-level trade creditA probabilistic approach to the stochastic fluid cash management balance problemThe effect of advance payment with discount facility on supply decisions of deteriorating products whose demand is both price and stock dependentOptimal two‐level trade credit with credit‐dependent demand in a newsvendor modelSupply chain financing with advance selling under disruptionBuilding a sustainability in a two-echelon closed loop supply chains: a mathematical approach for permissible delay in payment and backloggingAnalysis of inventory control model with shortage under time-dependent demand and time-varying holding cost including stochastic deteriorationEOQ Model Under Discounted Partial Advance—Partial Trade Credit Policy with Price-Dependent DemandOptimization of sample size and order size in an inventory model with quality inspection and return of defective itemsA lot sizing model with advance payment and planned backorderingSupply chain network design under advance-cash-credit paymentOptimal pre-order strategy with delay in paymentsA loss-averse retailer-supplier supply chain model under trade credit in a supplier-Stackelberg gameUnnamed ItemImperfect economic production quantity model with upstream trade credit periods linked to raw material order quantity and downstream trade credit periodsTwo-warehouse inventory model for deteriorating items with partial backlogging and advance payment schemeA two-warehouse probabilistic model with price discount on backorders under two levels of trade-credit policyOptimal replenishment time for retailer under partial upstream prepayment and partial downstream overdue payment for quadratic demand



Cites Work


This page was built for publication: Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain