Flow shop non-idle scheduling and resource-constrained scheduling
From MaRDI portal
Publication:271983
DOI10.1007/s10479-015-2070-7zbMath1334.90055OpenAlexW2283981505MaRDI QIDQ271983
Yen-Shing Tsai, Bertrand M. T. Lin
Publication date: 20 April 2016
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-015-2070-7
Cites Work
- Unnamed Item
- Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation
- Johnson's rule, composite jobs and the relocation problem
- A fast feasibility test for relocation problems
- The two-machine total completion time flow shop problem
- Polynomial algorithms for single machine scheduling problems with financial constraints
- An improved branch-and-bound algorithm for the two machine total completion time flow shop problem
- Stronger Lagrangian bounds by use of slack variables: Applications to machine scheduling problems
- Optimal two- and three-stage production schedules with setup times included
- The Complexity of Flowshop and Jobshop Scheduling
- A SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOP
This page was built for publication: Flow shop non-idle scheduling and resource-constrained scheduling