Enhancing CLP branch and bound techniques for scheduling problems
From MaRDI portal
Publication:2721220
DOI<17::AID-SPE355>3.0.CO;2-L 10.1002/1097-024X(200101)31:1<17::AID-SPE355>3.0.CO;2-LzbMath0963.68664OpenAlexW2069682444MaRDI QIDQ2721220
No author found.
Publication date: 1 July 2001
Full work available at URL: https://doi.org/10.1002/1097-024x(200101)31:1<17::aid-spe355>3.0.co;2-l
Computing methodologies and applications (68U99) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Logic programming (68N17)
Related Items (1)
Cites Work
- Minimizing conflicts: A heuristic repair method for constraint satisfaction and scheduling problems
- Constraint-based job shop scheduling with Ilog Scheduler
- Introducing global constraints in CHIP
- Solving TSP through the Integration of OR and CP Techniques
- An example of integrating constraint programming and mathematical programming
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- Solving Airline Crew Scheduling Problems by Branch-and-Cut
- Solving large combinatorial problems in logic programming
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Enhancing CLP branch and bound techniques for scheduling problems