An economic production quantity model with non-synchronized screening and rework
From MaRDI portal
Publication:272559
DOI10.1016/J.AMC.2014.01.150zbMath1334.90015OpenAlexW2025602065MaRDI QIDQ272559
Tsai-Chi Kuo, Wan-Tsu Wang, Yung-Lung Cheng, Yen-Deng Huang, Hui-Ming Wee
Publication date: 20 April 2016
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2014.01.150
Related Items (3)
Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments ⋮ Note on ``The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra ⋮ Production lot sizing with quality screening and rework
Cites Work
- Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
- The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra
- On optimal batch sizing in a multi-stage production system with rework consideration
- The complete solution procedure for the EOQ and EPQ inventory models with linear and fixed backorder costs
- Optimal batch sizing in a multi-stage production system with rework consideration
- Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint
This page was built for publication: An economic production quantity model with non-synchronized screening and rework