scientific article

From MaRDI portal
Publication:2743969

zbMath0968.90521MaRDI QIDQ2743969

George L. Vairaktarakis, Chung-Yee Lee

Publication date: 18 September 2001


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (26)

Two-machine flow shop scheduling with two criteria: maximum earliness and makespanMP or not MP: that is the questionSingle machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobsBi-criteria scheduling problems: Number of tardy jobs and maximum weighted tardinessA survey of single machine scheduling to minimize weighted number of tardy jobsPareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late workA note on proving the strong NP-hardness of a scheduling problem with position dependent job processing timesMinimizing maximum earliness and number of tardy jobs in the single machine scheduling problem with availability constraintMinimizing maximum earliness and number of tardy jobs in the single machine scheduling problemOn the complexity of bi-criteria scheduling on a single batch processing machineScheduling with time-dependent discrepancy timesA multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines.Proportionate flow shop with controllable processing timesScheduling to tradeoff between the number and the length of accepted jobsBicriterion scheduling with equal processing times on a batch processing machineUniform parallel machine scheduling problems with fixed machine costA note on proving the strong NP-hardness of some scheduling problems with start time dependent job processing timesSingle-machine scheduling under the job rejection constraintMinimizing makespan subject to minimum flowtime on two identical parallel machinesMulticriteria scheduling problems: a surveyGenetic algorithm for bi-criteria single machine scheduling problem of minimizing maximum earliness and number of tardy jobsBicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobsGenerating efficient schedules for identical parallel machines involving flow-time and tardy jobsMinimizing makespan subject to minimum total flow-time on identical parallel machinesPareto and scalar bicriterion optimization in scheduling deteriorating jobsUsing genetic algorithms for single-machine bicriteria scheduling problems




This page was built for publication: