Scheduling with Finite Capacity Output Buffers
From MaRDI portal
Publication:2770137
DOI10.1287/opre.46.3.S84zbMath0979.90059OpenAlexW4250785419MaRDI QIDQ2770137
Chris N. Potts, Nicholas G. Hall, Marc E. Posner
Publication date: 7 February 2002
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.46.3.s84
Related Items (6)
Hierarchical approach to production scheduling in make-to-order assembly ⋮ A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing ⋮ A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers ⋮ Integer programming approach to production scheduling for make-to-order manufacturing ⋮ Multi-objective master production scheduling in make-to-order manufacturing ⋮ Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
This page was built for publication: Scheduling with Finite Capacity Output Buffers