Multicriteria scheduling problems: a survey

From MaRDI portal
Publication:2773166

DOI10.1051/ro:2001109zbMath1014.90046OpenAlexW1985168944MaRDI QIDQ2773166

Jean-Charles Billaut, Vincent T'kindt

Publication date: 21 April 2002

Published in: RAIRO - Operations Research (Search for Journal in Brave)

Full work available at URL: http://www.numdam.org/item?id=RO_2001__35_2_143_0



Related Items

Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic, Single machine scheduling with two competing agents, arbitrary release dates and unit processing times, MP or not MP: that is the question, Makespan minimization subject to flowtime optimality on identical parallel machines, Optimal allocation and processing time decisions on non-identical parallel CNC machines: \(\epsilon\)-constraint approach, Fast approximation algorithms for bi-criteria scheduling with machine assignment costs, \(K\)-PPM: a new exact method to solve multi-objective combinatorial optimization problems, Single machine scheduling with two competing agents and equal job processing times, Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption, Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach, Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm, Complexity of two dual criteria scheduling problems, An exact parallel method for a bi-objective permutation flowshop problem, Algebraic solution of tropical optimization problems via matrix sparsification with application to scheduling, On optimizing a bi-objective flowshop scheduling problem in an uncertain environment, Parallel partitioning method (PPM): A new exact method to solve bi-objective problems, Rescheduling for new orders on a single machine with setup times, A survey on offline scheduling with rejection, Multi-criteria scheduling: an agent-based approach for expert knowledge integration, Two-agent scheduling with agent specific batches on an unbounded serial batching machine, Bi-objective optimization of single-machine batch scheduling under time-of-use electricity prices, A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem, Multiobjective bed management considering emergency and elective patient flows, Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres, Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost, On the approximate tradeoff for bicriteria batching and parallel machine scheduling problems., Multi-coloring and job-scheduling with assignment and incompatibility costs, Competitive multi-agent scheduling with an iterative selection rule, Minimizing setup costs for parallel multi-purpose machines under load-balancing constraint, Constrained clustering by constraint programming, No-wait flowshop scheduling problem with two criteria; total tardiness and makespan, Skilled workforce scheduling in service centres, Bi-criteria Pareto-scheduling on a single machine with due indices and precedence constraints, The resource dependent assignment problem with a convex agent cost function, Preemptive models of scheduling with controllable processing times and of scheduling with imprecise computation: a review of solution approaches, Scheduling batches in flowshop with limited buffers in the shampoo industry, Minimizing the number of late jobs when the start time of the machine is variable, Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints, A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems, Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates, Bicriterion scheduling with a negotiable common due window and resource-dependent processing times, An analysis of cyclic scheduling problems in robot centered cells, A recovering beam search algorithm for the single machine just-in-time scheduling problem, Best compromise solution for a new multiobjective scheduling problem, Due dates assignment and JIT scheduling with equal-size jobs, A parallel multiple reference point approach for multi-objective optimization, Maximization of solution flexibility for robust shop scheduling, The hybrid flow shop scheduling problem, Multipurpose machine scheduling with rejection and identical job processing times, Earliness-tardiness scheduling with setup considerations, A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness, Complexity analysis of an assignment problem with controllable assignment costs and its applications in scheduling, Analyzing scheduling with transient failures, Solving multi-criteria scheduling flow shop problem through compromise programming and satisfaction functions, Flowshop-scheduling problems with makespan criterion: a review, A tabu search algorithm for scheduling pharmaceutical packaging operations, Approximation results for a bicriteria job scheduling problem on a single machine without preemption, Scheduling interfering job sets on parallel machines, Multicriteria scheduling, A new bounding mechanism for the CNC machine scheduling problems with controllable processing times, A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects, Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs, A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines, Genetic local search for multi-objective flowshop scheduling problems, Punctuality and idleness in just-in-time scheduling, Bicriteria train scheduling for high-speed passenger railroad planning applications, A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs, Flexible solutions in disjunctive scheduling: general formulation and study of the flow-shop case, Scheduling with or without precedence relations on a serial-batch machine to minimize makespan and maximum cost, Flowshop scheduling research after five decades, Interactive bicriterion decision support for a large scale industrial scheduling system, Heuristics for hybrid flow shops with controllable processing times and assignable due dates, Scheduling two agent task chains with a central selection mechanism, Two-machine flowshop scheduling with a secondary criterion, Minimizing maximum lateness in two-stage projects by tropical optimization



Cites Work