scientific article
From MaRDI portal
Publication:2776548
zbMath1006.90040MaRDI QIDQ2776548
D. M. Loewenstern, Silvio Binato, William J. Hery, Mauricio G. C. Resende
Publication date: 12 March 2003
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Related Items (17)
Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach ⋮ A grasp-knapsack hybrid for a nurse-scheduling problem ⋮ Problems of discrete optimization: challenges and main approaches to solve them ⋮ Scheduling the truckload operations in automatic warehouses ⋮ An algorithm for the job shop scheduling problem based on global equilibrium search techniques ⋮ Hybrid genetic algorithm with multiparents crossover for job shop scheduling problems ⋮ Hybrid Metaheuristics: An Introduction ⋮ Exact and metaheuristic approaches to solve the integrated production scheduling, berth allocation and storage yard allocation problem ⋮ Ant colony optimization combined with taboo search for the job shop scheduling problem ⋮ Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times ⋮ Extended GRASP for the job shop scheduling problem with total weighted tardiness objective ⋮ A new hybrid genetic algorithm for job shop scheduling problem ⋮ A hybrid genetic algorithm for the job shop scheduling problem ⋮ Solving job shop scheduling problems utilizing the properties of backbone and ``big valley ⋮ A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness ⋮ Hybrid rollout approaches for the job shop scheduling problem ⋮ Memetic algorithms
This page was built for publication: