Sequential Production Planning Over Time at Minimum Cost
From MaRDI portal
Publication:2778581
DOI10.1287/mnsc.3.4.435zbMath0995.90530OpenAlexW2146765170MaRDI QIDQ2778581
Publication date: 22 October 2002
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.3.4.435
Related Items (11)
A quick and effective method for capacitated lot sizing with startup and reservation costs ⋮ A transportation type aggregate production model with bounds on inventory and backordering ⋮ On a Multi-stage Stochastic Programming Model for Inventory Planning ⋮ A noniterative multiproduct multiperiod production planning method ⋮ A faster algorithm for the resource allocation problem with convex cost functions ⋮ A pseudo-stochastic approach for optimal decision making under limited information: a case of an aggregate production system ⋮ Dynamic modeling and control of supply chain systems: A review ⋮ A branch and bound algorithm for a single item nonconvex dynamic lot sizing problem with capacity constraints ⋮ On the noniterative multiproduct multiperiod production planning method ⋮ Dual dynamic programming for linear production/inventory systems ⋮ An optimal algorithm for the multi-item capacitated production planning problem
This page was built for publication: Sequential Production Planning Over Time at Minimum Cost