Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Discussion: Sequencing n Jobs on Two Machines with Arbitrary Time Lags

From MaRDI portal
Publication:2778608
Jump to:navigation, search

DOI10.1287/mnsc.5.3.299zbMath0995.90537OpenAlexW2108451944MaRDI QIDQ2778608

Selmer Johnson

Publication date: 22 October 2002

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.5.3.299



Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)


Related Items (5)

Lot streaming in the two-machine flow shop with setup times ⋮ Two- and three-machine flow shop scheduling problems with equal sized transfer batches ⋮ An empirical analysis of the optimality rate of flow shop heuristics ⋮ The master-slave paradigm in parallel computer and industrial settings ⋮ Non-bottleneck machines in three-machine flow shops




This page was built for publication: Discussion: Sequencing n Jobs on Two Machines with Arbitrary Time Lags

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:2778608&oldid=15671722"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 3 February 2024, at 17:11.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki