Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Optimal approach for dynamic production control and workforce allocation of machining project

From MaRDI portal
Publication:2780809
Jump to:navigation, search

DOI10.1080/02522667.2001.10699510zbMath1004.90034OpenAlexW2017930780MaRDI QIDQ2780809

Weiya Chen, Long-Jyi Yeh, Yu-Tang Chen, Tian-Syung Lan

Publication date: 21 April 2002

Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/02522667.2001.10699510

zbMATH Keywords

parallel machinescalculus of variationsproduction controloperations researchworkforce allocationindustrial management


Mathematics Subject Classification ID

Management decision making, including multiple objectives (90B50) Production models (90B30) Economic growth models (91B62) Discrete location and assignment (90B80)




Cites Work

  • Manpower allocation using genetic annealing
  • Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
  • Scheduling of a machining center
  • On a comparison of objective function in optimal design of flexible production line with the unreliable machines
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:2780809&oldid=15665383"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 3 February 2024, at 16:09.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki