Scheduling with Finite Capacity Input Buffers
From MaRDI portal
Publication:2781130
DOI10.1287/opre.46.3.S154zbMath0987.90038MaRDI QIDQ2781130
Marc E. Posner, Chris N. Potts, Nicholas G. Hall
Publication date: 18 March 2002
Published in: Operations Research (Search for Journal in Brave)
Related Items (4)
A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers ⋮ Multi-objective master production scheduling in make-to-order manufacturing ⋮ Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers ⋮ A cyclic versus flexible approach to materials ordering in make-to-order assembly
This page was built for publication: Scheduling with Finite Capacity Input Buffers