Leadtime-Inventory Trade-Offs in Assemble-to-Order Systems
From MaRDI portal
Publication:2781161
DOI10.1287/opre.46.6.858zbMath0987.90004OpenAlexW2020141410MaRDI QIDQ2781161
Publication date: 18 March 2002
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/0d26149c485b67b5a50b9262432b6c71f8980005
Related Items (13)
Switchgear component commonality design based on trade-off analysis among inventory level, delivery lead-time and product performance ⋮ Managing an assemble-to-order system with after sales market for components ⋮ Unnamed Item ⋮ A note on the first moment of makespan in an assembly shop ⋮ Push verse pull: inventory-leadtime tradeoff for managing system variability ⋮ Optimal control of a nested-multiple-product assemble-to-order system ⋮ A typology and literature review on stochastic multi-echelon inventory models ⋮ Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes ⋮ A GENERALIZED STOCHASTIC PETRI-NET MODEL FOR PERFORMANCE ANALYSIS AND ALLOCATION OPTIMIZATION OF A PARTICULAR REPAIR SYSTEM ⋮ Minimizing response time in a two-stage supply chain system with variable lead time and stochastic demand ⋮ Approximations of lead-time distributions in an assemble-to-order system under a base-stock policy ⋮ Optimal control of a high-volume assemble-to-order system with maximum leadtime quotation and expediting ⋮ Misplaced inventory and lead-time in the supply chain: analysis of decision-making on RFID investment with service level
This page was built for publication: Leadtime-Inventory Trade-Offs in Assemble-to-Order Systems