Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources

From MaRDI portal
Publication:2783988

DOI10.1287/mnsc.44.6.859zbMath0989.90047OpenAlexW2123768088MaRDI QIDQ2783988

Holly S. Lewis, Elena Katok, Terry P. Harrison

Publication date: 17 April 2002

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.44.6.859




Related Items (16)






This page was built for publication: Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources