Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
From MaRDI portal
Publication:2788529
DOI10.1142/S0217595915500487zbMath1335.90048OpenAlexW2234789814MaRDI QIDQ2788529
Pankaj Dutta, Karuna Jain, M. Suresh
Publication date: 19 February 2016
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595915500487
Management decision making, including multiple objectives (90B50) Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36)
Related Items (3)
Resource-constrained multi-project scheduling problem: a survey ⋮ The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework ⋮ A tree search heuristic for the resource constrained project scheduling problem with transfer times
Uses Software
Cites Work
- Unnamed Item
- Scheduling of multiple projects with resource transfers
- Scheduling in resource-constrained multiple projects to minimise the weighted tardiness and weighted earliness of projects
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Two-phase heuristics for scheduling of multiple projects
- Scheduling a project to maximize its net present value: An integer programming approach
- Managing and modelling general resource transfers in (multi-)project scheduling
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- Rangen: A random network generator for activity-on-the-node networks
- Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
- Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
This page was built for publication: Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times