Hybrid multi-objective optimisation for concurrent activities consolidating two docked spacecraft
From MaRDI portal
Publication:2792228
DOI10.1080/00207721.2014.880198zbMath1332.93288OpenAlexW2048866998MaRDI QIDQ2792228
Guo-Jin Tang, Jin Zhang, Ya-zhong Luo
Publication date: 8 March 2016
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207721.2014.880198
schedulingmixed integer programmingmulti-objective optimisationrendezvous and dockingspace stationactivity planningspacecraft subsystems
Lua error in Module:PublicationMSCList at line 37: attempt to index local 'msc_result' (a nil value).
Cites Work
- Internal combustion engine control for series hybrid electric vehicles by parallel and distributed genetic programming/multiobjective genetic algorithms
- A genetic algorithm applied to a classic job-shop scheduling problem
- Relative position estimation using an extended Kalman filter during the homing phase of rendezvous and docking
- A mixed-integer programming model for global logistics transportation problems
- On the asymptotic optimality and improved strategies of SPTB heuristic for open-shop scheduling problem
- A goal programming approach for fuzzy multiobjective fractional programming problems
- Decomposition of timed automata for solving scheduling problems
- Trajectory planning/re-planning for satellite systems in rendezvous mission in the presence of actuator faults based on attainable efforts analysis
- An interval-parameter mixed integer multi-objective programming for environment-oriented evacuation management
- Environmentally constrained economic dispatch using Pareto archive particle swarm optimisation
- A solution procedure for mixed-integer nonlinear programming formulation of supply chain planning with quantity discounts under demand uncertainty
- Scheduling
This page was built for publication: Hybrid multi-objective optimisation for concurrent activities consolidating two docked spacecraft