A flow-based tabu search algorithm for the RCPSP with transfer times
From MaRDI portal
Publication:280159
DOI10.1007/s00291-015-0402-2zbMath1339.90150OpenAlexW655022694MaRDI QIDQ280159
Publication date: 4 May 2016
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-015-0402-2
Related Items (8)
Editorial ``Project management and scheduling ⋮ Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers ⋮ Integration of routing into a resource-constrained project scheduling problem ⋮ An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case ⋮ A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers ⋮ A tree search heuristic for the resource constrained project scheduling problem with transfer times
Uses Software
Cites Work
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- PSPLIB -- a project scheduling problem library
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- Project scheduling. A research handbook.
- A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- List scheduling in a parallel machine environment with precedence constraints and setup times
- Batch scheduling in process industries: An application of resource-constrained project scheduling
- Managing and modelling general resource transfers in (multi-)project scheduling
- Complex Scheduling
- Job Shop Scheduling by Simulated Annealing
- A Fast Taboo Search Algorithm for the Job Shop Problem
- Scheduling the production of rolling ingots: industrial context, model, and solution method
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: A flow-based tabu search algorithm for the RCPSP with transfer times