Machine scheduling in underground mining: an application in the potash industry
From MaRDI portal
Publication:280169
DOI10.1007/s00291-015-0414-yzbMath1339.90152OpenAlexW2233371331MaRDI QIDQ280169
Cinna Seifi, Marco Schulze, Julia Rieck, Jürgen Zimmermann
Publication date: 4 May 2016
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-015-0414-y
multi-starthybrid flow shopmixed integer linear programpriority rule-based procedurereentrant flowsunderground mining
Mixed integer programming (90C11) Linear programming (90C05) Deterministic scheduling theory in operations research (90B35)
Related Items (7)
Editorial ``Project management and scheduling ⋮ Underground mine scheduling of mobile machines using constraint programming and large neighborhood search ⋮ A real-world mine excavators timetabling methodology in open-pit mining ⋮ Staff and machine shift scheduling in a German potash mine ⋮ Solution procedures for block selection and sequencing in flat-bedded potash underground mines ⋮ A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers ⋮ Short-term scheduling of production fleets in underground mines using CP-based LNS
Uses Software
Cites Work
- Unnamed Item
- Optimization-based heuristics for underground mine scheduling
- Bounding strategies for the hybrid flow shop scheduling problem
- Using aggregation to optimize long-term production planning at an underground mine
- A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
- Modeling realistic hybrid flexible flowshop scheduling problems
- A survey of priority rule-based scheduling
- Global lower bounds for flow shops with multiple processors
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Sequencing of jobs in some production system
- A shortest-path algorithm for solving the fleet management problem in underground mines
- The hybrid flow shop scheduling problem
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- An integrated approach for modeling and solving the scheduling problem of container handling systems
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
- An enumeration algorithm for solving the fleet management problem in underground mines
- Handbook of operations research in natural resources. With the collaboration of Jaime Miranda
- Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines
- Two-Stage, Hybrid Flowshop Scheduling Problem
- A Survey of Scheduling Rules
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop
- Algorithms for Solving Production-Scheduling Problems
- Scheduling
This page was built for publication: Machine scheduling in underground mining: an application in the potash industry