Scheduling Identical Parallel Machines with a Fixed Number of Delivery Dates
From MaRDI portal
Publication:2806964
DOI10.1007/978-3-319-28697-6_55zbMath1342.90068OpenAlexW2461459748MaRDI QIDQ2806964
Arne Mensendiek, Jatinder N. D. Gupta
Publication date: 19 May 2016
Published in: Operations Research Proceedings (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-28697-6_55
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- Coordination of production and distribution planning
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Integrated Scheduling of Production and Distribution Operations
- Scheduling with Fixed Delivery Dates
- The Weighted Total Tardiness Problem with Fixed Shipping Times and Overtime Utilization
This page was built for publication: Scheduling Identical Parallel Machines with a Fixed Number of Delivery Dates