Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines

From MaRDI portal
Publication:2825621
Jump to:navigation, search

DOI10.7494/dmms.2013.7.1.43zbMath1351.90011OpenAlexW2117558077MaRDI QIDQ2825621

Waldemar Kaczmarczyk

Publication date: 13 October 2016

Published in: Decision Making in Manufacturing and Services (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.7494/dmms.2013.7.1.43

zbMATH Keywords

mixed integer programmingproduction planninglot-sizing and scheduling


Mathematics Subject Classification ID

Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Production models (90B30) Inventory, storage, reservoirs (90B05)


Related Items

Multi‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updating



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:2825621&oldid=15741876"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 3 February 2024, at 19:31.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki