Integrated Production Scheduling and Delivery Routing: Complexity Results and Column Generation
From MaRDI portal
Publication:2835699
DOI10.1007/978-3-319-45587-7_38zbMath1451.90056OpenAlexW2508199612MaRDI QIDQ2835699
Azeddine Cheref, Sandra Ulrich Ngueveu, Jean-Charles Billaut, Christian Artigues
Publication date: 30 November 2016
Published in: Lecture Notes in Computer Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-45587-7_38
Related Items
Robustness in nonsmooth nonconvex optimization problems, A review on integrated scheduling and outbound vehicle routing problems
Cites Work
- Machine scheduling with deliveries to multiple customer locations
- Integrated production and distribution scheduling with lifespan constraints
- A zero-inventory production and distribution problem with a fixed customer sequence
- Production scheduling with supply and delivery considerations to minimize the makespan
- An exact algorithm for a vehicle routing problem with time windows and multiple use of vehicles
- Machine scheduling with job delivery coordination
- Logistics scheduling with batching and transportation
- A branch-and-cut-and-price algorithm for the cumulative capacitated vehicle routing problem
- Optimal two- and three-stage production schedules with setup times included
- The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Scheduling with Fixed Delivery Dates
- The Complexity of Flowshop and Jobshop Scheduling
- Machine scheduling with pickup and delivery
- Machine scheduling with transportation considerations