JUST-IN-TIME SCHEDULING UNDER SCENARIO-BASED UNCERTAINTY
From MaRDI portal
Publication:2836525
DOI10.1142/S0217595912500558zbMath1267.90048OpenAlexW2031621633MaRDI QIDQ2836525
Dae-Young Chung, Byung-Cheon Choi
Publication date: 3 July 2013
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595912500558
Related Items (1)
Cites Work
- Minimizing the number of late jobs on a single machine under due date uncertainty
- On the robust single machine scheduling problem
- Approximation of min-max and min-max regret versions of some combinatorial optimization problems
- Complexity of single machine scheduling problems under scenario-based uncertainty
- A 2-approximation algorithm for interval data minmax regret sequencing problems with the total flow time criterion
- Min-max and min-max regret versions of combinatorial optimization problems: A survey
- Single machine scheduling to minimize the number of early and tardy jobs
- Faster algorithms for the shortest path problem
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
This page was built for publication: JUST-IN-TIME SCHEDULING UNDER SCENARIO-BASED UNCERTAINTY